[1] 刘长平,叶春明.置换流水车间调度问题的萤火虫算法求解[J].工业工程与管理,2012,17(3):56-59,65. [2] Garey M R, Johnson D S, Sethi R. The complexity of flowshop and jobshop scheduling[J]. Mathematics of Operations Research, 1976, 1(2): 117-129. [3] 刘三阳.置换流水车间调度问题的几种智能算法[D].西安电子科技大学:博士学位论文,2012. [4] Formato R A. Central force optimization: a new metaheuristic with applications in applied electromagnetics[J]. Progress in Electromagnetics Research, 2007, 77: 425-491. [5] Green R, Wang L, Alam M. Training neural networks using central force optimization and particle swarm optimization: insights and comparisons[J]. Expert Systems with Applications, 2012, 39: 555-563. [6] Haghighi A, Ramos HM. Detection of leakage freshwater and friction factor calibration in drinking networks using central force optimization[J]. Water Resource Manage, 2012, 26: 2347-2363. [7] Roa O, Amaya I, Ramirez F, Correa R. Solution of nonlinear circuits with the central force optimization algorithm[C]. Proceedings of the IEEE 4th Colombian Workshop on Circuits and Systems, Barranquilla, 2012: 1-6. [8] Chen Y B,Yu J Q ,Mei Y S, Wang Y, Su X. Modified central force optimization(MCFO)algorithm for 3D UAV path planning[J]. Neurocomputing, 2016, 171: 878-888. [9] 朱高峰,伍铁斌,张艳蕾,成运,刘云连.求解约束优化问题的中心引力优化算法及其工程应用[J].计算机应用研究,2013,30(10):2923-2926,2961. [10] Liu Y, Tian P. A multi-start central force optimization for global optimization[J]. Applied Soft Computing, 2015, 27: 92-98. [11] Maaranen H, Miettinen K, Mäkelä M M. Quasi-random initial population for genetic algorithms[J]. Computers & Mathematics with Applications, 2004, 47(12): 1885-1895. [12] Formato R A. Central force optimization with variable initial probes and adaptive decision space[J]. Applied Mathematics and Computation, 2011, 217(21): 8866-8872. [13] Carlier J. Scheduling with disjunctive constraints[J]. RAIRO-Operations Research, 1978, 12(4): 333-350. |