[1] PINEDO M. Scheduling Theory, Algorithms, and Systems[M]. New Jersey: Prentice-Hall, 2002. [2] GORDO V, PROTH J M, CCHU C B. A survey of the state-of-the-art of common due date assignment and scheduling research[J]. European Journal of Operational Research, 2002, 139(1): 1-25. [3] WENG M X, VENTURA J A. A note on common due window scheduling[J]. Production & Operations Management, 1996, 5(2): 194-200. [4] KRAMER F J, LEE C Y. Common due window scheduling[J]. Production & Operations Management, 1993, 2(4): 262-275. [5] AZIZOGLU M, WEBSTER S. Scheduling about an unrestricted common due window with arbitrary earliness/tardiness penalty rates[J]. IIE Transactions, 1997, 29(11): 1001-1006. [6] YEUNG W, OGUZ C, CHENG T C E. Minimizing weighted number of early and tardy jobs with a common due window involving location penalty[J]. Annals of Operations Research, 2001, 108(1-4): 33-54. [7] YEUNG W, OGUZ C, CHENG T C E. Single-machine scheduling with a common due window[J]. Computers & Operations Research, 2001, 28(2): 157-175. [8] LIMAN S D, PANWALKAR S S, THONGMEE S. Common due window size and location determination in a single machine scheduling problem[J]. Journal of the Operational Research Society, 1998, 49(9): 1007-1010. [9] JANICK A, WINCZASZEK M. A single processor scheduling problem with a common due window assignment[C]//FLEUREN H, HERTOG D, KORT P. Operations Research Proceedings. Springer-Verlag, Berlin/Heidelberg, 2004: 213-220. [10] JANIAK A, KWIATKOWSKI T, LICHTENSTEIN M. Scheduling problems with a common due window assignment: A survey[J]. International Journal of Applied Mathematics and Computer Science, 2013, 23(1): 231-241. [11] GUPTA J N D, GUPTA S K. Single facility scheduling with nonlinear processing times[J]. Computers & Industrial Engineering, 1988, 14(4): 387-393. [12] CHENG T C E, DING Q, LIU B M T. A concise survey of scheduling with time-dependent processing times[J]. European Journal of Operational Research, 2004, 152(1): 1-13. [13] ORAN D. Scheduling controllable processing time jobs in a deteriorating environment[J]. Journal of the Operational Research Society, 2013, 63(12): 1-8. [14] MOSHEIOV G. Scheduling jobs under simple linear deterioration[J]. Computers & Operations Research, 1994, 21(6): 653-659. [15] 刘静,闵啸.一个带退化工件的单机准时生产制问题[J].浙江大学学报(理学版),2010,37(1):34-37. [16] LIU J, WANG Y, MIN X. Single-machine scheduling with common due-window assignment for deteriorating jobs[J]. Journal of the Operational Research Society, 2013, 64(12): 1-11. [17] YUE Q, WAN G. Single machine SLK/DIF due window assignment problem with job-dependent linear deterioration effects[J]. Journal of the Operational Research Society, 2016, 67: 872-883. [18] BRUCKER P. Scheduling Algorithms[M]. New York: Springer, 1995: 243-244. |