[1] 马士华,林勇.供应链管理[M].第5版.北京:机械工业出版社,2016. [2] Sobolev I, Yong Y. Additive manufacturing impact for supply chain-two cases[J]. International Conference on Industrial Engineering and Engineering Management IEEM, 2017. 450-454. [3] Chen Z L. Integrated production and outbound distribution scheduling: review and extensions[J]. Operations Research, 2010, 58(1): 130-148. [4] Moons S, Ramaekers K, Caris A, Arda Y. Integrating production scheduling and vehicle routing decisions at the operational decision level: a review and discussion[J]. Computers & Industrial Engineering, 2017, 104: 224-245. [5] Geismar H N, Laporte G, Lei L, Sriskandarajah C. The integrated production and transportation scheduling problem for a product with a short lifespan[J]. INFORMS Journal on Computing, 2008, 20(1): 21-33. [6] Karaoğlan I, Kesen S E. The coordinated production and transportation scheduling problem with a time-sensitive product: a branch-and-cut algorithm[J]. International Journal of Production Research, 2017, 55(2): 536-557. [7] Armstrong R, Gao S, Lei L. A zero-inventory production and distribution problem with a fixed customer sequence[J]. Annals of Operations Research, 2008, 159(1): 395-414. [8] Viergutz C, Knust S. Integrated production and distribution scheduling with lifespan constraints[J]. Annals of Operations Research, 2014, 213(1): 293-318. [9] Low C, Li R K, Chang C M. Integrated scheduling of production and delivery with time windows[J]. International Journal of Production Research, 2013, 51(3): 897-909. [10] Devapriya P, Ferrell W, Geismar N. Integrated production and distribution scheduling with a perishable product[J]. European Journal of Operational Research, 2017, 259(3): 906-916. [11] Zou X X, Liu L, Li K P, Li W L. A coordinated algorithm for integrated production scheduling and vehicle routing problem[J]. International Journal of Production Research, 2018, 56(15): 5005-5024. [12] Cakici E, Mason S J, Kurz M E. Multi-objective analysis of an integrated supply chain scheduling problem[J]. International Journal of Production Research, 2012, 50(10): 2624-2638. [13] Li K, Zhou C, Leung J Y, Ma Y. Integrated production and delivery with single machine and multiple vehicles[J]. Expert Systems with Applications, 2016, 57: 12-20. [14] Chang Y C, Chang K H, Chang T K. Applied column generation-based approach to solve supply chain scheduling problems[J]. International Journal of Production Research, 2013, 51(13): 4070-4086. [15] Ullrich C A. Integrated machine scheduling and vehicle routing with time windows[J]. European Journal of Operational Research, 2013, 227(1): 152-165. [16] Li C L, Vairaktarakis G, Lee C Y. Machine scheduling with deliveries to multiple customer locations[J]. European Journal of Operational Research, 2005, 164(1): 39-51. [17] 赵玲.MTO环境下多客户生产与运输集成调度研究[D].武汉:华中科技大学,2011. [18] 刘玲,李昆鹏,刘志学.生产和运输协同调度问题的模型和算法[J].工业工程与管理,2016,21(2):86-91. [19] Lübbecke M E, Desrosiers J. Selected topics in column generation[J]. Operations Research, 2005, 53(6): 1007-1023. [20] Desrochers M, Desrosiers J, Solomon M M. A new optimization algorithm for the vehicle routing problem with time windows[J]. Operations Research, 1992, 40(2): 342-354. [21] Feillet D, Dejax P, Gendreau M, Gueguen C. An exact algorithm for the elementary shortest path problem with resource constraints: Application to some vehicle routing problems[J]. Networks, 2004, 44(3): 216-229. [22] 揭婉晨,杨珺,陆坚毅.基于分支定价算法的电动汽车车辆路径问题[J].运筹与管理,2016,25(4):93-100. [23] Luo Z X, Qin H, Lim A. Branch-and-price-and-cut for the multiple traveling repairman problem with distance constraints[J]. European Journal of Operational Research, 2014, 234: 49-60. |