[1] Wang Y, Liu Z, Liu Y. Optimal preventive maintenance strategy for repairable items under two-dimensional warranty[J]. Reliability Engineering and System Safety, 2015, 142: 326-333. [2] Wang J, Zhou Z, Peng H. Flexible decision models for a two-dimensional warranty policy with periodic preventive maintenance[J]. Reliability Engineering and System Safety, 2017, 162: 14-27. [3] Wang X, Su C. A two-dimensional preventive maintenance strategy for items sold with warranty[J]. International Journal of Production Research, 2016, 19(54): 5901-5915. [4] Chen C K, Lo C C, Weng T C. Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period[J]. European Journal of Operational Research, 2017, 259: 401-412. [5] Wang L, Pei Z, Zhu H, Liu B. Optimising extended warranty policies following the two-dimensional warranty with repair time threshold[J]. Eksploatacja i Niezawodnosc–Maintenance and Reliability, 2018, 20(4): 523-530. [6] Yeh R H, Ho W T, Tseng S T. Optimal production run length for products sold with warranty[J]. European Journal of Operational Research, 2000, 120: 575-582. [7] Yun W Y, Lee Y W, Ferreira L. Optimal burn-in time under cumulative free replacement warranty[J]. Reliability Engineering and System Safety, 2002, 78: 93-100. [8] Wu S, Clements-Croome D. Burn-in policies for products having dormant states[J]. Reliability Engineering and System Safety, 2007, 92: 278-285. [9] Chukova S, Hayakawa Y. Warranty cost analysis: non-zero repair time[J]. Applied Stochastic Models in Business and Industry, 2004, 20(1): 59-71. [10] Jung K M, Park M, Park D H. System maintenance cost dependent on life cycle under renewing warranty policy[J]. Reliability Engineering and System Safety, 2010, 95: 816-821. [11] Liu B, Wu J, Xie M. Cost analysis for multi-component system with failure interaction under renewing free-replacement warranty[J]. European Journal of Operational Research, 2015, 243: 874-882. [12] Xie W. Optimal pricing and two-dimensional warranty policies for a new product[J]. International Journal of Production Research, 2017, 22(55): 6857-6870. [13] Luo M, Wu S. A mean-variance optimisation approach to collectively pricing warranty policies[J]. International Journal of Production Economics, 2018, 196: 101-112. [14] Zhu X, Jiao C, Yuan T. Optimal decisions on product reliability, sales and promotion under nonrenewable warranties[J]. Reliability Engineering and System Safety, 2019, 192: 106268. [15] 卢震,王丽颖.按比例保修策略下多保修期差别定价研究[J].运筹与管理,2011,20(6):216-221. [16] Shang L, Cai Z. Optimal replacement policy of products with repair-cost threshold after the extended warranty[J]. Journal of Systems Engineering and Electronics, 2017, 28(4): 725-731. [17] Park M, Jung K M, Park D H. Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty[J]. Reliability Engineering and System Safety, 2018, 170: 1-9. [18] Jung K M, Park M, Park D H. Cost optimization model following extended renewing two-phase warranty[J]. Computers and Industrial Engineering, 2015, 79: 188-194. [19] Nakagawa T. Stochastic process with application to reliability theory[M]. London: Springer, 2011. [20] Wang G J, Zhang Y L. Optimal repair-replacement policies for a system with two types of failures[J]. European Journal of Operational Research, 2013, 226: 500-506. [21] Luo M, Wu S. A value-at-risk approach to optimisation of warranty policy[J]. European Journal of Operational Research, 2018, 26: 513-522. [22] Huang Y S, Gau, W Y, Ho J W. Cost analysis of two-dimensional warranty for products with periodic preventive maintenance[J]. Reliability Engineering and System Safety, 2015, 134: 51-58. [23] Pongpech J, Murthy D N P. Optimal periodic preventive maintenance policy for leased equipment[J]. Reliability Engineering and System Safety, 2006, 91: 772-777. |