[1] Wang Zhaojing, Hu Hao. Improved precast production-scheduling model considering the whole supply chain[J]. Journal of Computing in Civil Engineering, 2017, 31(4):04017013.1-04017013.12. [2] Zhiliang M A, Zhitian Y A N G, Shilong L I U, et al. Optimized rescheduling of multiple production lines for flowshop production reinforced precast concrete components[J]. Automation in Construction, 2018, 95(NOV.): 86-97. [3] Wang Z J, Hu H, Gong J. Modeling worker competence to advance precast production scheduling optimization[J]. Journal of Construction Engineering and Management, 2018, 144(11): 04018098.1-04018098.14. [4] Rom W O, Slontic S A. Order acceptance using genetic algorithms[J]. Computers & Operations Research, 2009, 36(6): 1758-1767. [5] Chen Y W, Lu Y Z, Yang G K. Hybrid evolutionary algorithm with marriage of genetic algorithm an extremal optimization for production scheduling[J]. International Journal of Advanced Manufacturing Technology, 2008, 36(9-10): 959-968. [6] Nobibon F T, Leus R. Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment[J]. Computers & Operations Research, 2011, 38(1): 367-378. [7] 王柏琳,王海凤,李铁克.工件可拒绝的有限等待置换流水车间调度算法[J].控制与决策,2019,34(3):459-469. [8] Wang X, Huang G, Hu X, et al. Order acceptance and scheduling on two identical parallel machines[J]. Journal of the Operational Research Society, 2015, 66(10): 1755-1767. [9] Wu G H, Cheng C Y, Yang H I, et al. An improved water flow-like algorithm for order acceptance and scheduling with Identical parallel machines[J]. Applied Soft Computing, 2017, 71(10): 1072-1084. [10] Lewis H F, Slotnick S A. Multi-period job selection: planning work loads to maximize profit[J]. Computers & Operations Research, 2002, 29(8): 1081-1098. [11] Susan A, Slotnick, et al. Order acceptance with weighted tardiness[J]. Computers & Operations Research, 2007, 34(10): 3029-3042. [12] 李俊青,潘全科,王法涛.求解混合流水线调度问题的离散人工蜂群算法[J].运筹与管理,2015(1):157-163. [13] Ruiz R, Pan Q K, Naderi B. Iterated Greedy methods for the distributed permutation flow-shop scheduling problem[J], Omega, 2019, 83(MAR): 213-222. [14] Ribas I, Companys R, Tort-Martorell X. An iterated greedy algorithm for the flowshop scheduling problem with blocking[J]. Omega, 2011, 39(3): 293-301. [15] 崔琪,吴秀丽,余建军,变邻域改进遗传算法求解混合流水车间调度问题[J].计算机集成制造系统,2017,23(9):1917-1927. |