[1]Yang X P, Gao P. A quantitative research of the time buffer of critical chain project management[C]. E-Business and E-Government(ICEE), 2011 International Conference on, 2011: 1-4. [2]万伟,蔡晨.基于PERT/CPM的关键链管理[J].中国管理科学,2003,11(6):35-39. [3]Peng W L, Xu H. The scheduling problem of active critical chain method[J]. Information Technology Journal, 2012, 11(7): 829-839. [4]Cohen I M, Baum A, Shtub A. Multi-project scheduling and control a process-based comparative study of the critical chain methodology and some alternatives[J]. Project Management Journal, 2004, 35(2): 39-50. [5]施骞,王雅婷,龚婷.项目缓冲设置方法及其评价指标改进[J].系统工程理论与实践,2012,32(8):1739-1746. [6]刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. [7]杨立熙,李世其,黄夏宝,等.属性相关的关键链计划缓冲设置方法[J].工业工程与管理,2009,14(1):11-14. [8]Yu J, Xu Z, Hu C. Buffer sizing approach in critical chain project management under multiresource constraints[C]//Information Management,Innovation Management and Industrial Engineering(ICIII), 2013 6th International Conference on. IEEE, 2013, 3: 71-75. [9]Luong D L, Ario O.Fuzzy critical chain method for project scheduling under resource constraints anduncertainty[J]. Int J of Project Management, 2008, 26(6): 688-698. [10]Gao P, Feng J W, Wang H T. Grey critical chain project scheduling technique and its application[J]. Canadian Social Science, 2007, 3(3): 35-41. [11]Ma G F, Li L, Chen Z Q. Research on the buffer sizing approach in critical chain scheduling in perspective of flexible management[M]. Springer-Verlag Berlin Heidelberg, 2012, 143: 61-68. [12]Bie L, Cui N, Zhang X. Buffer sizing approach with dependence assumption between activities in critical chain scheduling[J]. International Journal of Production Research, 2012, 50(24): 7343-7356. [13]Tukel O I, Rom W O, Eksioglu S.D.An investigation of buffer sizing techniques in critical chain scheduling[J]. European Journal of Operational Research, 2006, 172(2): 401-416. [14]Liu D, Chen J, Peng W. A new buffer setting method based on activity attributes in construction engineering[J]. Advanced Building Materials and Sustainable Architecture, 2012,174: 3274-3281. [15]Zhang X M, Cui N F, Bie L, Zuo F.Buffer sizing method with considering effect of various uncertainties based on fuzzy comprehensive evaluation method in critical chain scheduling[C]. Emergency Management and Management Sciences(ICEMMS), 2011 2nd IEEE International Conference on, 2011, 8: 566-569. [16]Lotfian F, Kimiagari A M, Pejmannia S, et al. Pricing policy in EPC oil & gas projects[J]. International Journal of Trade, Economics & Finance, 2010, 1(2): 207-210. [17]Thomas S R, Lee S H, Park H S. Design-information technology and performances in building and industrial projects[J]. Canadian Journal of Civil Engineering, 2008, 35(10): 1102-1113. [18]Alsakini W, Wikstrm K, Kiiras J. Proactive schedule management of industrial turnkey projects in developing countries[J]. International Journal of Project Management, 2004, 22(1): 75-85. [19]Ma C J, Cao G L. Performance management based on EPC construction mode[J]. Applied Mechanics and Materials, 2012,209: 1286-1289. [20]Edward E, Douglas III. Schedule levels of detail-as applied in engineering, procurement and construction[C]. AACE International, 2010, 3: 564-572. [21]Wang C, Zhang L. Study on purchasing process optimization of overseas EPC projects[J]. Contemporary Logistics, 2011(5): 348-351. [22]Van der Vorst J G A J, Beulens A J M. Identifying sources of uncertainty to generate supply chain redesign strategies[J]. International Journal of Physical Distribution & Logistics Management, 2002, 32(6): 409-430. [23]Cheng E W L, Li H. Construction partnering process and associated critical success factors: quantitative investigation[J]. Journal of management in engineering, 2002, 18(4): 194-202. [24]Robert Hauser J. Corn-based ethanol in Illinois and the U.S.: a report from the department of agricultural and consumer economics[C]. University of Illinois, 2007, 3: 44-45. [25]Sambasivan M, Soon Y W. Causes and effects of delays in malaysian construction industry[J]. International Journal of project management, 2007, 25(5): 517-526. [26]Yeo K T, Ning J H. Integrating supply chain and critical chain concepts in engineer-procure-construct(EPC)projects[J]. International Journal of Project Management, 2002, 20(4): 253-262. [27]Galloway P. Design-build/EPC contractor’s heightened risk—changes in a changing world[J]. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2009, 1(1): 7-15. [28]Dai P. Contract management for international EPC projects[D]. Southeast University, China, 2009: 37-84. [29]王建铭,谭京.EPC/交钥匙工程实施过程中对当地资源依赖性的分析[J].项目管理,2009(2):58-60. [30]陈安邦,王守清,郑超.对外承包工程案例分析方法框架[J].项目管理技术,2007,(1):32-38. [31]Chen J Y, Damanpour F, Reilly R R. Understanding antecedents of new product development speed: a meta-analysis[J]. Journal of Operations Management, 2010, 28(1): 17-33. [32]Keith G, Fred L, Marek S. An exploratory study of ‘close’ supplier-manufacturer relationships[J]. Journal of Operations Management, 2006, 24(2): 189-209. [33]吴明隆.SPSS统计应用实务——问卷分析与应用统计[M].北京:科学出版社,2003,10:28-119. [34]单汨源,龙颖.一种关键链缓冲机制改进方法及其应用研究[J].项目管理技术,2006,(9):32-35. [35]Vesna C, Knez J. Why and how to evaluate the credit worthiness of SMEs’ business partners[J]. International Small Business Journal, 2005, 23(2): 143-162. [36]Wang J J, Qiao Q, Miettinen M E, et al. The metabolic syndrome defined by factor analysis and incident type 2 diabetes in a Chinese population with high postprandial glucose[J]. Diabetes Care, 2004, 27(10): 2429-2437. [37]Prakash P, Yellboina S, Ranjan A, et al. Computational prediction and experimental verification of novel Ider binding sites in the upstream sequences of mycobacterium tuberculosis open reading frames[J]. Bioinformatics, 2005, 21(10): 2161-2166. |