[1] Popescu C A, Simion C P. A method for defining critical infrastructures [J]. Energy, 2012, 42(1): 32-34. [2] 袁媛,樊治平,刘洋.生命线网络系统多节点失效的应急抢修队伍派遣模型研究[J].运筹与管理,2012,21(1):131-135. [3] 刘晓,张隆飙,Zhang W J, Tu Y L.关键基础设施及其安全管理[J].管理科学学报,2009,12(6):107-115. [4] Baiardi F, Telmon C, Sgandurra D. Hierarchical, model-based risk management of critical infrastructure[J]. Reliability Engineering and System Safety, 2009, 94(9): 1403-1405. [5] Krger W. Critical infrastructures at risk: a need for a new conceptual approach and extended analytical tools[J]. Reliability Engineering and System Safety, 2008, 93(12): 1781-1787. [6] Cha E J, Ellingwood B R. Risk-averse decision-making for civil infrastructure exposed to low-probability, high-consequence events[J]. Reliability Engineering and System Safety, 2012, 104(1): 27-35. [7] Zhang P C, Peeta S. A generalized modeling framework to analyze interdependencies among infrastructure systems[J]. Transportation Research, Part B: Methodological, 2011, 45(3): 553-579. [8] Giorgio A D, Liberati F. A Bayesian network-based approach to the critical infrastructure interdependencies analysis[J]. IEEE Systems Journal, 2012, 6(3): 510-519. [9] Prezelj I, Ziberna A. Consequence, time and interdependency-based risk assessment in the field of critical infrastructure[J]. Risk Management, 2013, 15(2): 100-131. [10] Franchina L, Carbonelli M, Gratta L, Crisci M, Perucchini D. An impact-based approach for the analysis of cascading effects in critical infrastructures[J]. International Journal of Critical Infrastructures, 2011, 7(1): 73-90. [11] Hernandez I, Dueas-Osorio L. Probabilistic study for cascading failures in interdependent lifeline systems[J]. Reliability Engineering and System Safety, 2013, 111(1): 260-272. [12] Kjolle G H, Utne I B, Gjerde O. Risk analysis of critical infrastructures emphasizing electricity supply and interdependencies[J]. Reliability Engineering and System Safety, 2012, 105(1): 80-89. [13] Seyedhoseini S M, Siamak N, Hatefi M A. An integrated methodology for assessment and selection of the project risk response actions[J]. Risk Analysis, 2009, 29(5): 752-763. [14] Kujawski E, Angelis D. Monitoring risk response actions for effective project risk management[J]. System Engineering, 2010, 13(4): 353-368. [15] 杨莉,李南.软件项目风险应对措施优选的区间模型及其算法[J].控制与决策,2011,26(4):530-534. [16] 张尧,陈曦,樊治平.综合考虑多因素的项目风险应对策略选择方法[J].技术经济,2013,32(5):74-77. [17] Nasirzadeh F, Khanzadi M, Mianabadi H. A fuzzy group decision making approach to construction project risk management[J]. International Journal of Industrial Engineering & Production Research, 2013, 24(1): 71-80. [18] Ouyang M. Review on modeling and simulation of interdependent critical infrastructure systems[J]. Reliability Engineering and System Safety, 2014, 121(1): 43-60. [19] Suh N P. Axiomatic design: advances and applications[M]. New York: Oxford University Press, 2001. [20] Mayag B, Grabisch M, Labreuche C. A characterization of the 2-additive choquet integral through cardinal information[J]. Fuzzy Sets and Systems, 2011, 184(1): 84-105. |