[1] 蒋红妍,王鑫业,彭颖.建筑施工中的两阶段学习曲线模型[J].土木工程与管理学报,2018,35(6):43-49. [2] Ammar M A. LOB and CPM integrated method for scheduling repetitive projects[J]. Journal of Construction Engineering and Management, 2013, 139(1): 44-50. [3] 王伟鑫,葛显龙,王旭,等.基于软逻辑关系的重复性项目调度工期:费用优化研究[J].管理工程学报,2017,31(1):201-207. [4] 蒋红妍,王鑫业,徐锐.基于时间参数表的RSM图绘制方法[J].土木工程与管理学报,2016,33(4):18-23. [5] Altuwaim A, El-Rayes K. Minimizing duration and work interruptions of repetitive construction projects[J]. Automation in Construction, 2018, 88: 59-72. [6] Ammar M A. Optimization of line of balance scheduling considering work interruption[J]. International Journal of Construction Management, 2022, 22(2): 305-316. [7] Tang Y J, Liu R K, Wang F, et al. Scheduling optimization of linear schedule with constraint programming[J]. Computer-Aided Civil and Infrastructure Engineering, 2018, 33(2): 124-151. [8] 张立辉,邹鑫,黄元生,等.重复性项目调度模型的时差分析[J].中国管理科学,2018,26(6):95-103. [9] Dolabi H R Z, Afshar A, Abbasnia R. CPM/LOB scheduling method for project deadline constraint satisfaction[J]. Automation in Construction, 2014, 48: 107-118. [10] 邹鑫,张倩,乞建勋.基于LOB的重复性项目调度方法评述与比较[J].中国管理科学,2016,24(S1):246-252. [11] Suhail S A, Neale R H. CPM/LOB: New methodology to integrate CPM and line of balance[J]. Journal of Construction Engineering and Management, 1994, 120(3): 667-684. [12] Arditi D, Tokdemir O B, Suh K J, et al. Scheduling system for repetitive unit construction using line-of-balance technology[J]. Engineering Construction and Architectural Management, 2001, 8(2): 90-103. [13] Tokdemir O B, Arditi D, Balcik C. ALISS: Advanced linear scheduling system[J]. Construction Management and Economics, 2006, 24(12): 1253-1267. [14] Ammar M A. Economics. Resource optimisation in line of balance scheduling[J]. Construction Management and Economics, 2020, 38(8): 715-725. [15] Zhang L H, Qi J X. Controlling path and controlling segment analysis in repetitive scheduling method[J]. Journal of Construction Engineering and Management, 2012, 138(11): 1341-1345. [16] 张立辉,邹鑫,乞建勋,等.重复性建设项目中确定关键路线的方法研究[J].运筹与管理,2015,24(1): 142-148. [17] 张立辉,邹鑫,乞建勋.基于逆控制工序的重复性项目最短工期计算方法[J].中国管理科学,2015,23(9):171-176. [18] Zhang L, Tang Y, Qi J X. Resource leveling based on backward controlling activity in line of balance[J]. Mathematical Problems in Engineering, 2017: 7545980: 1-9. [19] 张立辉,潘楚云,邹鑫.重复性项目调度与网络模型转化方法研究[J].管理科学学报,2014,17(6):49-59. |