[1] Crama Y, Oosten M. Models for machine-part grouping in cellular manufacturing[J]. International Journal of Production Research, 1996, 34: 1693-1713. [2] Vanessa T U, Flavia M S, Marcos R S. A context-based model for knowledge management embodied in work processes[J]. Information Sciences, 2009. 1-17. [3] Redwine C N, Wismer D A. A mixed integer programming model for scheduling orders in a steel mill[J]. Journal of Optimization Theory and Applications, 1974, 14(3): 305-318. [4] Luh P B, Hoitomt D J. Scheduling of manufacturing systems using the Lagrangian relaxation technique[J]. IEEE Transactions on Automatic Control, 1993, 38(7): 1066-1079. [5] Dong Cao, and Mingyuan Chen. A mixed integer programming model for a two line CONWIP-based production and assembly system, 2005, 95: 317-216. [6] Yves C. Combinatorial optimization models for production scheduling in automated manufacturing systems[J]. European Journal of Operational Research, 1997, 99, 136-153. [7] Chen H X, Luh P B. An alternative framework to Lagrangian relaxation approach for job shop scheduling[J]. European Journal of Operational Research, 2003, 149: 499-512. [8] Berber R, Yuceer M, Ozdemir Z. Automatic generation of production scheduling models in single stage multi-product batch plants: Some examples[J]. Mathematical and Computer Modelling, 2007, 46: 69-79. [9] Li X T, Liu G L. A mathematical programming model and solution for scheduling production orders in shanghai baoshan iron and steel Complex[J]. European Journal of Operational Research, 2007, 182, 1453-1468. [10] WU Yingfeng, WANG Dawei. A mathematical programming model for optimization problem of production process based on time constraints in pinggao group Co., Ltd. Proceeding of the 6th?International Conference on Economic Engineering and Manufacturing Systems(Iceems2011), 2011. 424-428. [11] Melo M T, Nickel S, Saldanha da Gama F. Dynamic multi-commodity capacitated facility location: a mathematical modeling framework for strategic supply chain planning[J]. Computers & Operations Research, 2006, 33(1): 181-208. [12] 朱战国,孙林岩,吴瀛峰.基于服务距离限制和匹配运输的工厂选址问题[J].运筹与管理.2010,19(2):40-44. |