[1] Cédric Clastres. Smart grids: another step towards competition, energy security and climate change objectives[J]. Energy Policy, 2011, 39(9): 5399-5408. [2] Jamshid Aghaei, Mohammad-Iman Alizadeh. Demand response in smart electricity grids equipped with renewable energy sources: a review[J]. Renewable and Sustainable Energy Reviews, 2013, 18(2): 64-72. [3] 颜伟,文旭,余娟,李一铭,赵霞.智能电网环境下电力市场面临的机遇与挑战[J].电力系统保护与控制,2010,38(24):224-230. [4] 余贻鑫,栾文鹏.智能电网述评[J].中国电机工程学报,2009,29(34):1-8. [5] 刘亚安,管晓宏.考虑风险因素的两市场购电优化分配问题[J].电力系统自动化,2002,26(9):1-4. [6] 郭金,江伟,谭忠富.风险条件下供电公司最优购电问题研究[J].电网技术,2004,28(11):18-23. [7] 周明,聂艳丽,李庚银,倪以信.电力市场下长期购电方案及风险评估[J].中国电机工程学报,2006,26(6):116-122. [8] 周明,李庚银,严正,倪以信.考虑备用需求和风险的供电企业最优购电计划[J].电网技术,2005,29(3):33-36. [9] 王壬,尚金成,周晓阳,张勇传,张士军.基于条件风险价值的购电组合优化及风险管理[J].电网技术,2006,30(20):72-76. [10] 谢品杰,谭忠富,王绵斌,侯建朝.基于CVaR的供电公司现货市场购电优化决策模型[J].电工技术学报,2009,24(4):186-192. [11] 陈彦州,赵俊华,文福拴,杨首晖,方日升.偏度风险价值下供电公司/电力零售公司动态购电组合策略[J].电力系统自动化,2011,35(6):25-29. [12] Ludvik Bartelj, Dejan Paravan, Andrej F. Gubina, Robert Golob. Valuating risk from sales contract offer maturity in electricity market[J]. Electrical Power and Energy Systems, 2010, 32(2): 147-155. [13] Jianhui Wang, Antonio J. Conejo, Chengshan Wang, Jinyue Yan. Smart grids, renewable energy integration, and climate change mitigation—future electric energy systems[J]. Applied Energy, 2012, 96(8): 1-3. [14] 魏玲,杨明皓.输配分离电力市场中含分布式发电的配电公司购电模型[J].电网技术,2008,32(8):71-76. [15] 周玮,孙辉,顾宏,马千,陈晓东.计及风险备用约束的含风电场电力系统动态经济调度[J].中国电机工程学报,2012,32(1):47-55. [16] 于晗,钟志勇,黄杰波,张建华.考虑负荷和风电出力不确定性的输电系统机会约束规划[J].电力系统自动化,2009,33(2):20-24. [17] 胡艳梅,吴俊勇.含间歇式电源电力系统风险评估的研究综述[J].冶金电气,2012,(2):89-92. [18] Clara Novoa, Tongdan Jin. Reliability centered planning for distributed generation considering wind power volatility[J]. Electric Power Systems Research, 2011, 81(8): 1654-1661. [19] Wei Zhou, Hui Sun and Yu Peng. Risk reserve constrained economic dispatch model with wind power penetration[J]. Energies, 2010, 3(12): 1880-1894. [20] 申洪,王伟胜.一种评价风电场运行情况的新方法[J].中国电机工程学报,2003,23(9):90-93. [21] Ehsan Alishahi, MohsenP. Moghaddam, MohammadK. Sheikh-El-Eslami. An investigation on the impacts of regulatory interventions on wind power expansion in generation planning[J]. Energy Policy, 2011, 39(8): 4614-4623. [22] Cun-bin Li, Gong-shu Lu, Si Wu. The investment risk analysis of wind power project in China[J]. Renewable Energy, 2013, 50(2): 481-487. [23] Jin J, Tian Z. Uncertainty analysis for wind energy production with dynamic power curves[C]. 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2010: 745-750. [24] 李存斌.项目风险元传递理论与应用[M].中国水利水电出版社,2009. [25] 瞿勇,张建军,宋业新.多重纳什均衡解的粒子群优化算法[J].运筹与管理,2010,19(2):52-55. [26] 马豫超,侯志俭,蒋传文等.基于粒子群算法求解电力市场发电商最优供给函数模型[J].电力系统自动化,2006,30(2):45-50. [27] 王晓佳,张宝霆,徐达宇.含有压缩因子的粒子群优化灰色模型在智能电网中的应用[J].运筹与管理,2012,21(3):114-118. [28] Lingfeng Wang, Chanan Singh. Balancing risk and cost in fuzzy economic dispatch including wind power penetration based on particle swarm optimization[J]. Electric Power Systems Research, 2008, 78(8): 1361-1368. |